Cris
Začátečník
Hello Zbynek,
Many thanks for the wonderful activity and also thanks to the colleague for this extra service of a translation into German!
It is the longest activity I have ever done with MSTS, and I really enjoyed it.
Above all, I’m amazed that the TS can cope with the many static train sets which are available for taking.
I had tried something like that on the route Szczecin-Berlin by Halycon, but I had to share this activity already after 2 hours.
For your success and my failure, I suppose the following reasons:
1. Recource-friendly track-layout at BP
2. Recource-saving construction of the vehicles of BP Trainset
3. Partial use of “polygon monster” vehicles in my activity
4. to much traffic in my activity (40 trains per hour)
The only thing which didn’t work in the TOPIRNA activity was the following: at the start of the task there is a building site with wrong line operation and speed limit. Thereafter, during the whole activity, a notice is shown in case of speed-up about 45 km/h: the speed of 40 km/h has been exceeded.
Sorry, if maybe someone else has written about this topic in this forum. Unfortunately, I cannot read Czech. I have translated some passages in this forum, word-by-word, but that really takes a lot of time.
In Germany, there are a lot of fans of the Czech and Slovak trains and its performance in MSTS.
We look forward to further nice activities by you and the other MSTS friends.
Best regards
Cris
Many thanks for the wonderful activity and also thanks to the colleague for this extra service of a translation into German!
It is the longest activity I have ever done with MSTS, and I really enjoyed it.
Above all, I’m amazed that the TS can cope with the many static train sets which are available for taking.
I had tried something like that on the route Szczecin-Berlin by Halycon, but I had to share this activity already after 2 hours.
For your success and my failure, I suppose the following reasons:
1. Recource-friendly track-layout at BP
2. Recource-saving construction of the vehicles of BP Trainset
3. Partial use of “polygon monster” vehicles in my activity
4. to much traffic in my activity (40 trains per hour)
The only thing which didn’t work in the TOPIRNA activity was the following: at the start of the task there is a building site with wrong line operation and speed limit. Thereafter, during the whole activity, a notice is shown in case of speed-up about 45 km/h: the speed of 40 km/h has been exceeded.
Sorry, if maybe someone else has written about this topic in this forum. Unfortunately, I cannot read Czech. I have translated some passages in this forum, word-by-word, but that really takes a lot of time.
In Germany, there are a lot of fans of the Czech and Slovak trains and its performance in MSTS.
We look forward to further nice activities by you and the other MSTS friends.
Best regards
Cris
Naposled editoval moderátor: